Five Steps for Preparation Before Installing an Integrated PUMPS Station
Integrated PUMPS Station is a new type of equipment used for sewage collection, treatment, and lifting. It adopts an underground installation method. Whether it can maintain stable operation and achieve a long service life depends heavily on maintenance, but early preparation work is also very important. So what preparations are required before installation? The detailed explanation is as follows.
First, before installation, the foundation must be prepared in advance — including determining the installation location, reserving sufficient space, coordinating with relevant construction departments, and properly completing technical disclosure and excavation planning.
Second, the drainage system in the construction area should be designed according to the terrain, site conditions, drainage volume, and other factors to ensure compatibility with various site requirements.
Third, before installation, the foundation pit must be inspected and cleaned. The installation drawings and equipment construction requirements should be reviewed carefully to verify relevant dimensions. During construction, a complete construction quality inspection procedure and control measures should be established.
Fourth, before construction operations, safety and technical briefings should be provided to workers and documented properly.
Fifth, during installation, on-site equipment, tools, and construction materials should be placed neatly to maintain clear and clean passageways, ensuring efficient and orderly installation work.